Jump to content

santhosh2020

Members
  • Content Count

    1
  • Joined

  • Last visited

  1. I have DUT interface with A,B (list of singals) that needs to be driven with some timing dependency . A is cmd interface ,B is data interface . Now i plan to implement driver should i have separate sequence from signals list A and signals list B . If so how would i synchronize two sequences sequences so that i meet the timing relation between these two . Or should i have implemeted both cmd and data in same sequence item and have the logic in driver so it driver cmd and data after timing is meet . I dont like this approach as i need fill my driver with timing code . I want my timing inform
×
×
  • Create New...